News
Charlotte -Douglas is getting more than $21 million from the FAA to help pay for a new runway. Republican U.S. Senator Thom ...
One of the four runways at will be closing at Minneapolis-St. Paul International Airport ... The "12R-30L" is MSP's 10,000-foot, east-west parallel runway located on the south side of Terminal 1.
A contractor is extending one of two runways at Joint Base Elmendorf-Richardson by 2,900 feet, which will give the base two 10,000-foot runways, according to the Air Force Installation and Mission ...
It might get through federal studies quicker than a 10,000-foot runway recommended in the airport’s 2018 master plan, Beebe said. A previous FAA study found no significant impacts with the 8,000 ...
No snow job too big for huge runway plow. By Jeffrey Leib Denver Post Staff Writer March 29, 2001 - Normally, United Airlines Capt. Alan Sowell can be found in the cockpit of the Boeing 727.. But this ...
Hosted on MSN2mon
Runway construction may temporarily alter MSP Airport flight patterns this spring, summerThe agency said that it plans to close the south parallel runway of the Minneapolis-St. Paul International Airport to do construction work for ... a 10,000-foot, runway running east-west along the ...
The runway project at CLT involves the construction of a new 10,000-foot-long (3,048 meters), 150-foot-wide (46 meters) parallel runway west of Runway 18C/36C.
The existing 10,000-foot runway was built in the 1980s. ... The FAA previously determined the runway can be built at 10,639 feet, which would provide more distance for takeoff and landing.
The runway being targeted for these improvements is 12R-30L, a 10,000-foot, runway running east-west along the south side of Terminal 1. More from CBS News.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results