News
10d
Tom's Hardware on MSNMusk’s Colossus is fully operational with 200,000 GPUs backed by Tesla batteries — Phase 2 to consume 300 MW, enough to power 300,000 homesT he first phase of Elon Musk’s xAI Memphis Supercluster has just reached full operational capacity as the on-site substation ...
6d
ExtremeTech on MSNElon Musk's xAI Colossus Supercomputer Is on Its Way to 1 Million GPUsThe supercluster now has 200,000 GPUs and is drawing from the main power grid in Memphis.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results